Where we work
Builders in Lewisham
We build in Lewisham for private clients: extensions, loft conversions, refurbishments and new homes. Its houses range from Victorian terraces to larger Edwardian and interwar homes, and we plan each project around the house.
What we build in Lewisham
- New buildsHouses built from the ground up, on a clear plot or in place of an existing home.
- Complete refurbishmentsWhole houses taken back and rebuilt inside, with services and finishes renewed.
- Pool buildingsIndoor swimming pool buildings in three ranges: Classic, Signature and Distinctive.
- BasementsNew basements and lower-ground floors beneath existing houses.
- ExtensionsRear, side and double-storey extensions for more kitchen and living space.
- Loft conversionsDormer and mansard lofts, planned around the room you need.
- Design and buildThe drawings, the approvals and the build, with our own in-house architect and structural engineer.
- RenovationsRenovations of single rooms or whole floors, from new layouts to new finishes.
- InteriorsJoinery, finishes and fitted interiors for new and existing homes.
- Kitchens and bathroomsKitchen and bathroom renovations, from layout to finish.
- Structural alterationsWall removals, steel beams and new openings, with calculations from our in-house structural engineer.
- Garden roomsGarden rooms and outbuildings for work, guests or hobbies.
- Garden landscapingTerraces, paths, planting and lawns, laid out to suit the house.
- RoofingNew roofs, roof replacement and repairs.
- HMO conversionsConverting houses for multiple occupation.
- CommercialBuilding work for shops, offices and other commercial premises.
Tell us about your house in Lewisham.
Arrange a consultation, or send us your drawings. Your architect or designer is welcome to join us.