Blog
Guides to building and renovating a home
What to think through before you start, and how the work runs. Each guide links to the official sources it relies on.
Refurbishment
- How a complete house refurbishment runs, stage by stageThe usual order of a complete house refurbishment, from survey and approvals to strip-out, services, finishes and handover, with what to decide at each stage.
- Living at home during building work: what to expectWhen it is realistic to stay at home during building work, when to move out and how to plan for dust, noise, services, kitchens, access and security.
- Refurbish or rebuild? How to decide for an older houseHow to choose between refurbishing an older house and replacing it: structure, layout, planning, VAT, time out of the house and the questions to ask first.
- Renovating a house: what to decide before work startsThe renovation decisions that are hardest to change later: layout, services, lighting, kitchens, joinery, floors and long-lead items, and when to make them.
New builds
- Building a bespoke new home: from plot to handoverThe main stages of building a bespoke private house: checking the plot, assembling a team, planning, technical design, appointing a builder and handover.
- What a high-specification home build really depends onA high-end finish depends less on costly materials than on what sits beneath them: decisions, flat surfaces, drying time, coordination, samples and protection.
Extensions and outbuildings
- Do you need planning permission for a house extension?When a house extension in England is permitted development and when it needs planning permission: rear and side limits, height, prior approval and local rules.
- Garden rooms with a shower room: what to plan forWhat to plan for when adding a shower room to a garden room: how you will use it, planning limits, building regulations, drainage, heating and insulation.
- Planning an indoor pool building: what to think throughWhat to think through before building an indoor pool in your garden: planning limits, siting, structure, ventilation, plant, glazing and access.
Structure and below ground
- Building a new basement: the questions to answer firstQuestions to answer before building a basement under a house: planning, party walls, ground and water, structure, waterproofing, drains, access and neighbours.
- Removing a load-bearing wall: what the work involvesWhat removing a load-bearing wall involves: identifying it, calculations, building control, party walls, temporary support, steel beams and making good.
Planning and approvals
- Building regulations approval explained for homeownersWhat building regulations approval is, how it differs from planning, full plans or a building notice, competent persons and completion certificates.
- The Party Wall Act explained for homeownersWhat the Party Wall etc. Act 1996 means for your building work: which works it covers, notice periods, the 3 and 6 metre rules, surveyors, awards and costs.
Choosing a builder
- Design and build or a separate architect: which suits your project?A fair comparison of design and build and appointing a separate architect: who is responsible, how the price is set, and which suits different home projects.
- How to choose a builder for a substantial home projectWhat to check before you appoint a builder for a major home project: company details, memberships, insurance, past work, the site team, contract and payments.
- How to compare builders’ quotes for a major projectHow to compare builders’ quotes fairly: provisional sums, exclusions, preliminaries, VAT, programme and the questions to ask when one price looks much lower.
Tell us about your home.
Arrange a consultation, or send us your drawings. Your architect or designer is welcome to join us.