Skip to content
Stock & Slate Developments, home

Service

Complete house refurbishments in London and the home counties

Whole houses taken back and rebuilt inside, with services and finishes renewed.

A refurbished bathroom with marble-effect tiles, a bath, a black-framed shower and a wood-effect vanity unit

Complete refurbishments

A complete refurbishment takes a whole house back to its structure and rebuilds it to today’s standards: new wiring, plumbing and heating, insulation, kitchens, bathrooms and finishes, all in one programme. It is the work where the order matters most. Done in sequence, each trade builds on finished work. Done out of order, new plaster gets cut for cables and new floors get lifted for pipes.

Who it suits

Houses that have not been modernised for decades, owners buying a property to make their own and homes where the layout needs to change as well as the finishes.

What it includes

  • Surveys, and opening up where we can, before the scope is fixed
  • Stripping the house back to its structure
  • Structural work such as removing walls, new steels and timber repairs
  • New electrics, plumbing and heating, before any walls are plastered
  • Insulation to floors, walls and roofs where the work calls for it
  • Kitchens and bathrooms, with layouts fixed early
  • Plastering, flooring, doors, fitted joinery and decoration
  • A walk round the finished house, then the certificates and manuals

Things to consider

What is behind the surfaces

In an older house, much of the cost depends on what sits behind the plaster and under the floor: the age of the wiring, the condition of the joists and any damp or rot. The more that is known before pricing, the fewer surprises later.

Asbestos

The Health and Safety Executive says asbestos may be part of any domestic building built or refurbished before the year 2000. If your house falls into that group, it needs checking before work disturbs the fabric of the building.

Fix the layout early

Kitchen and bathroom layouts decide where pipes and cables run, so they need settling before first fix. Changing them later usually means undoing finished work.

Moving out

For a complete refurbishment most families move out. Services, floors and stairs are all affected, and the work usually runs more smoothly in an empty house.

Approvals

Structural work, new heating and many other changes need building regulations approval. Work affecting a shared wall can bring in the Party Wall Act. Each has its own timescale, so they belong in the programme from the start.

Improving an old house

A refurbishment is the moment to deal with what makes older houses cold and costly to run. Building regulations can also require insulation to be upgraded when walls, floors or roofs are substantially renovated.

Our approach

How a project runs
  1. First conversation
  2. Design and approvals
  3. Programme and price
  4. The build
  5. Handover and aftercare

Credentials

Held by Right Choice Builders Group Ltd, which trades as Stock & Slate.

  • FMB member
  • Gas Safe registered
  • NAPIT registered
  • TrustMark registered
  • £5 million public liability insurance
  • £10 million professional indemnity insurance
  • 12-month warranty on all structural builds

Questions clients ask

Can we live at home during a complete refurbishment?

It depends on the work, but for a complete refurbishment most families move out. We will talk it through at the consultation.

What happens if the strip-out reveals something new?

Older houses often hold surprises. Our quotation sets out what is known and what is a provisional allowance, and if something new appears, you see its cost before that work goes ahead.

Will I have a fixed scope and price before work starts?

Before any work starts, you receive an itemised quotation, a payment plan and a contract. We agree the specification, the programme and the price in writing.

Do I need my own architect?

Not necessarily. We have our own in-house architect and structural engineer, and we also work alongside clients’ own architects and designers.

What paperwork will I receive at the end?

We walk the finished house with you, complete any remaining items and hand over the certificates and manuals. Keep them, because you will need certificates of compliance when you come to sell.

Related guides

All guides

For architects and designers

We work within your team.

Send us drawings and a specification and we will talk through the build with you and your client.

Other services

Areas we cover

Tell us about your home.

Arrange a consultation, or send us your drawings. Your architect or designer is welcome to join us.