Service
New build homes in London and the home counties
Houses built from the ground up, on a clear plot or in place of an existing home.

New builds
Building a new home is a different project from extending one. The planning case, the ground investigation, the energy calculations and the utility connections all have to be in place before the first brick, and those early stages are often where time is won or lost. We build houses from the ground up for private clients, on a clear plot or in place of an existing home.
Who it suits
Owners replacing a house that no longer works on a good plot, those with a gap, corner or garden plot and clients with a clear idea of how they want to live and a wish to build it properly.
What it includes
- Working with your architect, or with our own in-house architect, from early design
- Structural design, with our in-house structural engineer or your own
- Coordinating the utility companies and building control
- Foundations, frame, roof and envelope
- Heating, ventilation, electrics and plumbing
- Joinery, finishes and fitted interiors
- Landscaping and garden work, where it is part of the project
- Handover with certificates and manuals
Things to consider
Replacement house or new plot
Replacing a house means demolition and a new building on the same plot. A new house on a gap or garden plot is judged on how it fits the street and its effect on the neighbours, and access and services need checking early.
Check the plot first
Title and covenants, planning history, access, ground conditions, trees and drains can all limit what you can build. Find out before you commit, not after the design is drawn.
Planning
A new house will need planning permission. In the Green Belt, a replacement house generally must not be materially larger than the one it replaces. Permissions often come with conditions that must be met before work starts.
Today’s building regulations
A new home must meet the current regulations in full, including energy standards, overheating, water efficiency and, where parking is provided, electric vehicle charging. These affect the design, so they are worked through before work starts.
VAT
Building a new dwelling can be zero-rated if the conditions in HMRC’s Notice 708 are met. If you are replacing a house, it must generally be demolished completely to ground level. Take specialist advice before relying on this.
Our approach
How a project runs- First conversation
- Design and approvals
- Programme and price
- The build
- Handover and aftercare
Credentials
Held by Right Choice Builders Group Ltd, which trades as Stock & Slate.
- FMB member
- Gas Safe registered
- NAPIT registered
- TrustMark registered
- £5 million public liability insurance
- £10 million professional indemnity insurance
- 12-month warranty on all structural builds
Questions clients ask
Should we rebuild or refurbish our existing house?
It depends on the structure, the layout you want, planning and VAT. Ask for an outline of both before deciding. We work on both, so we can talk it through with you and your architect.
Do you work with our architect?
Yes. We work alongside clients’ own architects and designers from early design. We also have our own in-house architect and structural engineer if you need them.
Who is responsible for building regulations and safety?
Your project should have a named principal designer and principal contractor. If you do not appoint them, the regulations say the designer and contractor in control of each phase take those roles. It is worth having this confirmed in writing.
What warranty do you provide?
We provide a 12-month warranty on all structural builds. A lender or future buyer may ask about longer structural warranty cover on a new home, so raise this with us early.
How much do new homes cost?
It depends on the plot, the design and the specification. We take on projects up to £3 million, and we give you an itemised quotation, a payment plan and a contract before any work starts.
Related guides
All guidesFor architects and designers
We work within your team.
Send us drawings and a specification and we will talk through the build with you and your client.
Other services
Areas we coverTell us about your home.
Arrange a consultation, or send us your drawings. Your architect or designer is welcome to join us.