Classic
Timber indoor pool buildings, with an exposed timber roof, rooflights and glazed doors onto the garden.
Service
Indoor swimming pool buildings in three ranges: Classic, Signature and Distinctive.

An indoor pool building lets you swim all year, and it has to cope with heat, humidity and chemicals in every season. It also becomes part of the view from the house, so it is designed with the home and the garden in mind. We build pool buildings in three ranges, in materials chosen to suit the house, including brick, render, timber and glass.
Homes with a large enough garden and owners who want to use a pool all year, for swimming, exercise or family time, in a building that suits the house.
Pool buildings
Timber indoor pool buildings, with an exposed timber roof, rooflights and glazed doors onto the garden.






Higher-specification pool buildings, clad in timber or finished in render or brick, with wide glazed doors and exposed timber roofs.






Pool buildings with bespoke architecture, designed around the house and the garden, from contemporary to traditional.






A heated pool constantly gives off moisture, and warm air condenses on anything cold. Ventilation, dehumidification and insulation must be designed with the building, or condensation can damage the structure and finishes over time.
Some pool buildings can be permitted development, but the limits are tight: single storey, up to 4 metres high with a dual-pitched roof, and no more than 2.5 metres high within 2 metres of a boundary. Many projects will need an application.
Small outbuildings can be exempt, but a pool building will generally be larger than the size limits for that, so plan on needing approval. Your building control body can confirm what applies.
Consider the sun, the view from the house, privacy from neighbours, trees and drains. The route from the house will be walked in bare feet, so it needs to be pleasant and safe in wet weather.
Excavation means getting machinery into the garden, and spoil out of it. Plan the route early, along with what will be protected and how the garden will be restored afterwards.
Held by Right Choice Builders Group Ltd, which trades as Stock & Slate.
Possibly. The Planning Portal lists swimming pools among outbuildings that can be permitted development if they meet the conditions. Many buildings exceed the limits, and designated land and local rules can tighten them further.
Permitted development covers buildings incidental to the enjoyment of the house. It does not cover separate self-contained living accommodation, which normally needs planning permission.
We build Classic, Signature and Distinctive pool buildings. You can see photos of our own work in each range on this page, and we can talk through which suits your house and garden.
Yes. We work alongside clients’ designers, and we also carry out garden landscaping. It helps to plan the garden at the same time as the building.
For architects and designers
Send us drawings and a specification and we will talk through the build with you and your client.
Arrange a consultation, or send us your drawings. Your architect or designer is welcome to join us.