Service
House extensions in London and the home counties
Rear, side and double-storey extensions for more kitchen and living space.

Extensions
A good extension starts with the plot, not the kitchen brochure. The shape of your land, the position of your neighbours, the drains and the trees decide which extension makes sense and what it will involve. We build rear, side-return, wraparound and double-storey extensions, to a structural engineer’s design and inspected by building control.
Who it suits
Homes where the ground floor feels narrow or cut off from the garden, families who need a larger kitchen and living space and owners who want to stay in a house they like instead of moving.
What it includes
- A review of the ground, drains, trees and boundaries
- Drawings and approvals, with our in-house architect or your own
- Structural design and steelwork from a structural engineer
- Foundations, drainage, walls and roof
- Rooflights and large glazed doors
- Heating, electrics and plumbing
- Kitchens, utility rooms and downstairs WCs built into the same footprint
- Finishes, decoration, certificates and manuals
Things to consider
Rear extensions
These run across the back of the house into the garden. A single-storey rear extension can be permitted development up to 4 metres on a detached house or 3 metres on other houses, subject to the other limits.
Side returns
On many period terraces, a narrow strip beside the rear addition can be roofed over to widen the kitchen. It sits on or near the boundary, so party wall notices and a careful roof detail are part of the job from the first drawing.
Wraparounds
These combine a rear and a side-return extension in one L-shaped structure, for a room across the width of the house. They often need a planning application, and the steelwork needs careful design.
Double-storey extensions
These add a bedroom or bathroom above the new ground-floor room. Under permitted development, an extension of more than one storey can go no more than 3 metres beyond the rear wall, and many will need planning permission.
Drains and neighbours
Thames Water says that in its area you are likely to need a build over agreement to build within 3 metres of a public sewer. Digging close to a neighbour can bring in the Party Wall Act, which has its own notice periods.
Plan around the kitchen
Floor levels, drain runs, electrical points and door positions all depend on the kitchen layout. Settle it before the slab goes in, and appoint your kitchen company early enough for its drawings to guide the build.
Our approach
How a project runs- First conversation
- Design and approvals
- Programme and price
- The build
- Handover and aftercare
Credentials
Held by Right Choice Builders Group Ltd, which trades as Stock & Slate.
- FMB member
- Gas Safe registered
- NAPIT registered
- TrustMark registered
- £5 million public liability insurance
- £10 million professional indemnity insurance
- 12-month warranty on all structural builds
Questions clients ask
Do I need planning permission for an extension?
Some extensions can be built without it under permitted development, and others need it. Your architect, or our in-house architect, usually applies. Tighter rules apply on designated land, and past extensions may have used up your allowance.
Can we live at home during an extension?
For an extension you can often stay. The disruption peaks when the new room is opened into the house, and you will need a temporary kitchen for part of the work.
Do I need a party wall agreement?
You probably do if you are working on a shared wall, building on the boundary or digging close to a neighbour’s foundations. Notice periods run from one to two months, so allow for them in your plans.
Will I need building regulations approval even without planning permission?
Yes, they are separate. Building regulations cover the structure, fire safety, insulation and drainage, among other things. Most extensions need to comply.
What will I receive before work starts?
An itemised quotation, a payment plan and a contract, with the specification, programme and price agreed in writing. The first consultation is free of charge.
Related guides
All guidesFor architects and designers
We work within your team.
Send us drawings and a specification and we will talk through the build with you and your client.
Other services
Areas we coverTell us about your home.
Arrange a consultation, or send us your drawings. Your architect or designer is welcome to join us.
