Service
Basement construction in London and the home counties
New basements and lower-ground floors beneath existing houses.

Basements
A new basement can add space that a house could not otherwise gain, but it is among the most demanding projects you can carry out on a home. It affects the ground beneath your house and perhaps your neighbours’ too. So the first step is finding out whether it makes sense for your site, with a structural engineer involved from the start.
Who it suits
Houses with no room to extend outwards or upwards, on sites where the ground, access and planning policy make a new lower floor realistic.
What it includes
- A feasibility review of the site and the existing house
- Site investigation of the ground and groundwater
- Structural design, including temporary support for the house above
- Planning and building regulations approvals
- Party wall matters with neighbours
- Excavation, underpinning and removal of spoil
- Waterproofing and drainage
- Means of escape, ventilation, services and finishes
Things to consider
New basement or conversion
Converting an existing basement is unlikely to need planning permission unless you add a lightwell, change the outside or create a new unit. A new basement will commonly need permission because of the major works involved.
Local planning policy
Local planning documents may limit the depth and size of a basement, and lightwells at the front can face stricter rules. Talk to your local planning authority before spending heavily on design.
Ground and water
Soil type, groundwater and any flooding history shape the structure, the waterproofing and the way the basement is built. A site investigation comes before detailed design.
Keeping it dry
Water is the central technical issue. Ask what the waterproofing system is and who designed it, how any pumps are serviced and what happens in a power cut.
Your neighbours
You must give notice under the Party Wall Act if you excavate within 3 metres of a neighbouring building and go deeper than its foundations, or within 6 metres if the work reaches a 45-degree line from them.
Spoil and access
A basement means moving a large amount of soil out of the site, often through a small space. On a tight London street, this can decide both the method and the programme.
Our approach
How a project runs- First conversation
- Design and approvals
- Programme and price
- The build
- Handover and aftercare
Credentials
Held by Right Choice Builders Group Ltd, which trades as Stock & Slate.
- FMB member
- Gas Safe registered
- NAPIT registered
- TrustMark registered
- £5 million public liability insurance
- £10 million professional indemnity insurance
- 12-month warranty on all structural builds
Questions clients ask
Do I need planning permission for a new basement?
Commonly, yes. The Planning Portal says a new basement will commonly require planning permission, often because of the major works involved and any effect on the outside of the house.
Does the Party Wall Act apply to a basement?
Very often. Excavation close to a neighbouring building needs at least one month’s notice, and work to a shared wall needs at least two months. A party wall award may also be needed.
Can we stay at home during the work?
Ask about your own project, because noise, vibration and service disruption can be substantial. Many owners choose to move out.
What should we do first?
Start with a feasibility review from a structural engineer and an architect. We have our own in-house architect and structural engineer, and the first consultation is free of charge.
Related guides
All guidesFor architects and designers
We work within your team.
Send us drawings and a specification and we will talk through the build with you and your client.
Other services
Areas we coverTell us about your home.
Arrange a consultation, or send us your drawings. Your architect or designer is welcome to join us.