Skip to content
Stock & Slate Developments, home

Service

Design and build in London and the home counties

The drawings, the approvals and the build, with our own in-house architect and structural engineer.

Illustration: the front elevation of a house above its floor plan, with a kitchen, living room and study

Our approach

How a project runs
  1. First conversation
  2. Design and approvals
  3. Programme and price
  4. The build
  5. Handover and aftercare

Credentials

Held by Right Choice Builders Group Ltd, which trades as Stock & Slate.

  • FMB member
  • Gas Safe registered
  • NAPIT registered
  • TrustMark registered
  • £5 million public liability insurance
  • £10 million professional indemnity insurance
  • 12-month warranty on all structural builds

Related guides

All guides

For architects and designers

We work within your team.

Send us drawings and a specification and we will talk through the build with you and your client.

Other services

Areas we cover

Tell us about your home.

Arrange a consultation, or send us your drawings. Your architect or designer is welcome to join us.