Where we work
Builders in Peckham
We build extensions, loft conversions and refurbishments in Peckham. Much of Peckham is Victorian and Edwardian terraces, where a rear extension or a new loft room is often the best way to add space.
What we build in Peckham
- New buildsHouses built from the ground up, on a clear plot or in place of an existing home.
- Complete refurbishmentsWhole houses taken back and rebuilt inside, with services and finishes renewed.
- Pool buildingsIndoor swimming pool buildings in three ranges: Classic, Signature and Distinctive.
- BasementsNew basements and lower-ground floors beneath existing houses.
- ExtensionsRear, side and double-storey extensions for more kitchen and living space.
- Loft conversionsDormer and mansard lofts, planned around the room you need.
- Design and buildThe drawings, the approvals and the build, with our own in-house architect and structural engineer.
- RenovationsRenovations of single rooms or whole floors, from new layouts to new finishes.
- InteriorsJoinery, finishes and fitted interiors for new and existing homes.
- Kitchens and bathroomsKitchen and bathroom renovations, from layout to finish.
- Structural alterationsWall removals, steel beams and new openings, with calculations from our in-house structural engineer.
- Garden roomsGarden rooms and outbuildings for work, guests or hobbies.
- Garden landscapingTerraces, paths, planting and lawns, laid out to suit the house.
- RoofingNew roofs, roof replacement and repairs.
- HMO conversionsConverting houses for multiple occupation.
- CommercialBuilding work for shops, offices and other commercial premises.
Tell us about your house in Peckham.
Arrange a consultation, or send us your drawings. Your architect or designer is welcome to join us.