Project
Complete refurbishment of a house in Sutton
Every room of a Sutton house taken from dated interiors to a bright, modern home.

- Area
- Sutton
- Work
- Complete refurbishments, Interiors, Structural alterations, Kitchens and bathrooms
What we built
Structural reconfiguration, bespoke joinery, new flooring, electrical upgrades and contemporary lighting throughout, with a full bathroom refurbishment. The bedrooms gained fitted storage and built-in desks.
The result
A bright, consistent home with clean finishes in every room, and a fully tiled bathroom and shower room.
Film
20 seconds on site




Before and after
The same rooms, before and after
Drag across the photo to compare.
















Photo tour
Room by room
Walk through the finished house. Choose a room, use previous and next, or swipe. Arrow keys work too.

Room 1 of 10 · view 1 of 3: Front room
Front room
Wood flooring, a new radiator and a recess in the chimney breast
Rooms
Planning a comparable project?
Arrange a consultation, or send us your drawings. Your architect or designer is welcome to join us.