Project
Rear extension and garden room in Wimbledon
A significant rear extension to a terraced house and a garden room at the end of the garden.

- Area
- Wimbledon
- Work
- Extensions, Garden rooms, Kitchens and bathrooms
What we built
A single-storey rear extension with a flat roof, rooflights and wide glazed doors onto the garden, a new kitchen, and a timber-clad garden room with its own shower room.
The result
A new island kitchen at the back of the house, and a separate garden room with a shower room of its own.
Film
21 seconds on site







Photo tour
Room by room
Walk through the finished house. Choose a room, use previous and next, or swipe. Arrow keys work too.

Room 1 of 8 · view 1 of 2: From above
From above
The new rear extension, centre, from above
Rooms
Planning a comparable project?
Arrange a consultation, or send us your drawings. Your architect or designer is welcome to join us.