Building a house for yourself is one of the few projects where almost everything is open to choice. That freedom is the appeal, and it is also the risk. Most of the decisions that shape the cost and quality of the house are made long before anyone arrives on site.
Check the plot before you commit
A plot can look perfect and still carry problems. Before you buy, or before you commit to replacing an existing house, ask a solicitor and your design team to look into:
- Title and covenants: what the deeds allow, and any rights of way or restrictions
- Planning history: what has been applied for, refused or approved nearby
- Access: how materials, machines and deliveries will reach the site
- Ground conditions: soil type, groundwater and any past use of the land
- Trees: protected trees can limit where you build, and work to them may need consent from the local planning authority
- Drains and services: where sewers, water, gas and power run. In Thames Water’s area, you are likely to need a build over agreement to build within 3 metres of a public sewer
- Neighbours: party walls, and excavation close to their foundations
Assemble the team
You will usually need an architect and a structural engineer, along with other specialists such as a mechanical and electrical designer, an interior designer and a landscape designer. Decide early whether you want a separate architect or a design and build route. A builder can add useful practical advice from early design, even if the formal price comes later.
The Royal Institute of British Architects sets out building projects in eight stages in its Plan of Work. Architects commonly use it to describe what is done when, so it is worth asking yours to explain where you are at each point.
Write the brief
A clear brief saves money. Say how you want to live in the house, what matters most and what you could do without. Give the team an honest overall budget, and say whether it includes fees, VAT, landscaping and furniture.
Planning permission
A new house will need planning permission. Consider asking the local planning authority for pre-application advice. Expect conditions on the permission, some of which must be dealt with before work starts. Allow time for them in your programme.
Technical design
Planning drawings do not tell a builder how to build the house. Technical design adds the structure, construction details, services, finishes and fixtures. The further you take this before pricing, the more reliable the price will be and the fewer surprises you will find later.
Building regulations and your legal duties
The work must comply with building regulations. Since October 2023, the regulations have set out duties for clients, designers and contractors. On a project with more than one contractor, a domestic client should appoint a principal designer and a principal contractor. The regulations say that if no appointment is made, the designer in control of the design phase is the principal designer, and the contractor in control of the construction phase is the principal contractor.
Ask your team to confirm who holds these roles, and put it in writing.
VAT
Construction of a new dwelling can be zero-rated if the conditions in HMRC’s Notice 708 are met. If you are replacing a house, the existing building must be demolished completely to ground level, with limited exceptions. Architects, surveyors and consultants still charge standard-rate VAT. Take specialist advice before you rely on this.
Appoint your builder
Choose a builder you can work with for a long time. Ask to see comparable completed houses, and read our guide on how to choose a builder. Agree the specification, programme, price and contract in writing, and ask what warranty is offered. Your lender or a future buyer may also ask about structural warranty cover, so raise it early.
On site
A typical sequence runs from enabling works and groundworks through to the frame, roof, windows, services, plastering, joinery and finishes, with landscaping last. Keep your decisions moving, because a late choice can hold up the trades waiting on it.
Handover
Walk the finished house with your builder. List any outstanding items and agree when they will be done. Collect the certificates, manuals and warranties, along with the building control completion certificate.
We build new homes with our own in-house architect and structural engineer, or alongside yours. The first consultation is free of charge.
Sources
- RIBA: Plan of Work
- Legislation.gov.uk: Building Regulations etc. (Amendment) (England) Regulations 2023
- HMRC: Buildings and construction (VAT Notice 708)
- GOV.UK: Tree preservation orders and trees in conservation areas
- Thames Water: Do I need a build over agreement?
This guide is general information for homes in England, not legal, tax or planning advice. Rules change and every house differs, so check with your local planning authority, your building control body or a qualified adviser before relying on it.