Choosing a builder is the most important decision on a major home project. You will work with them for months or even years, and they will be responsible for your largest asset. A careful choice takes time, but it costs far less than putting a poor one right.
Check who you are dealing with
Find out which legal entity you would be contracting with. Trading names are common and perfectly normal, but your contract should show the registered company behind one. Search for the company on Companies House, where you can check its status, its registered office and whether its accounts are up to date.
Verify memberships and registrations
Logos are easy to copy, so check claims at the source. The Federation of Master Builders and TrustMark both let you look up firms. For specialist work, check the relevant register too, such as Gas Safe for gas work. Make sure the entry matches the company you are contracting with.
Ask to see the insurance
Ask for current certificates, and look at the level of cover and the expiry date. Public liability insurance is the basic one. If the builder is also providing design, ask about professional indemnity cover. Check how the works and your existing house will be insured during the build, and tell your home insurer about the project before work starts.
Look at comparable work
A good kitchen extension does not prove someone can run a whole-house refurbishment. Ask for projects of a similar size and complexity to yours. Then:
- Visit a finished project if you can, and look closely at the details
- Speak to a past client. Ask how problems were handled, as well as what went well
- If you can, see a live site. Tidiness and organisation tell you a lot
- Read reviews on independent platforms, and look at how the business answers criticism
Ask who will actually run your job
You are hiring a team, not only a company. Ask who will manage the project day to day, how often they will be on site, who will be your point of contact and how you will be kept informed. Ask which trades are directly employed and which are subcontracted, and who is responsible for coordinating them.
Meet the person who will run the site if you can. You will be speaking to them often.
Be clear about approvals
Ask who will deal with planning, building control and party wall matters, and whose cost each one is. Our guides to building regulations and the Party Wall Act explain what is involved.
Ask too who will act as principal contractor. HSE explains that on most domestic projects the client duties under the Construction (Design and Management) Regulations 2015 pass to the contractor or principal contractor.
Get the price in writing
Ask for an itemised quotation against a clear specification, and check what is excluded. Be wary of a price far below the others. It may mean something has been missed, and the difference may return later as extras. Read our guide to comparing quotes.
Sign a written contract
A written contract protects both sides. It should cover the scope, price, payment plan, programme, how changes are priced and approved, what happens if there are delays, how defects are dealt with and how disputes are resolved. Take advice if a project is large or the wording is unclear.
Understand the payment plan
Payment arrangements differ between builders. What matters is that you understand them before you sign. Ask how much is due, when, what each payment covers and what triggers it. A plan tied to clear stages, such as foundations, brickwork and roof, makes it easier for both sides to see where things stand.
Ask about warranties and aftercare
Ask what warranty is offered, what it covers and how long it lasts. Find out how snags are handled after handover, and who you should call if something goes wrong. Ask for the certificates and manuals you will receive at the end.
Trust your judgement
After the checks, ask yourself some simple questions. Did they listen? Did they ask good questions about your house? Did they tell you anything you did not want to hear? A builder who raises difficulties early is usually more useful than one who agrees with everything.
You can see how we work on our approach page, and our credentials on our about page. We provide an itemised quotation, a payment plan and a contract before any work starts, and the first consultation is free of charge.
Sources
- Companies House
- Federation of Master Builders: Find a builder
- TrustMark
- HSE: CDM 2015 and domestic clients
This guide is general information for homes in England, not legal, tax or planning advice. Rules change and every house differs, so check with your local planning authority, your building control body or a qualified adviser before relying on it.