Three quotes for the same project can look completely different, and the lowest total is not always the lowest final cost. The real task is to work out whether the builders have priced the same job. Here is how to do that.

Give everyone the same information

Quotes only compare fairly when they are based on the same drawings, specification and scope. If you describe the project verbally to three builders, you will receive three prices for three different projects.

Send each builder the same package, and answer any questions in a way that all of them can see. If one builder suggests a change, ask the others to price it too.

Ask for an itemised breakdown

A single total tells you very little. Ask for the price to be broken down by stage or trade, so you can see where the differences lie. A gap in one line can show that something has been missed or misunderstood.

Read what is excluded

The exclusions can matter more than the inclusions. Items that are often left out or treated differently include:

  • Building control and planning fees
  • Party wall surveyors’ fees and any protective work
  • Structural engineer’s and other consultants’ fees
  • Kitchens, bathrooms and appliances
  • Decoration, flooring and fitted joinery
  • Landscaping, drainage connections and service connections
  • Skips, scaffolding and any street licences

Understand allowances

Many quotes contain sums for things that have not yet been fully decided or investigated.

Prime cost sums are allowances for items you will choose later, such as a kitchen or tiles. Check that the allowance fits what you want. If you want a much finer kitchen than the allowance covers, the true price is higher than the quote suggests.

Provisional sums are allowances for work that cannot yet be fully defined, such as repairs to something hidden. The final figure may go up or down.

A low quote with low allowances may not be cheaper at all. Compare the fixed price and the allowances separately.

Look for preliminaries

“Preliminaries” are the costs of running the site rather than building a particular item: site management, scaffolding, welfare, insurance, waste, temporary protection and so on. Some builders list them, while others spread them through the price. They are real costs either way. If one quote has almost none, ask how they are covered.

Check the VAT

Make sure every quote is shown on the same basis. HMRC’s Notice 708 explains that work to an existing building is normally standard-rated, with different rates in certain situations such as building a new dwelling. Ask whether each price includes VAT, and at what rate. If a price assumes a lower rate, ask why and take advice.

Compare the programme

A price and a programme belong together. Ask each builder for a start date and a duration. A much shorter programme may be reasonable, or it may not allow for drying times, lead times or approvals. Ask what would need to be true for it to be met.

Ask how changes will be priced

Almost every project changes somewhere. Ask how variations will be priced, who approves them and how they will be recorded. The answer should be in writing and in the contract.

Consider what is outside the builder’s price

To budget properly, add your own costs. Party wall costs can be significant. The government’s party wall booklet says the building owner generally pays the costs of the award, including the adjoining owner’s surveyor, when the work is solely for their benefit. Add design fees, moving costs, storage and a contingency.

When one price is much lower

Do not simply accept it, and do not simply reject it. Ask the builder to walk you through it. They may have a sound reason, or they may have missed something. A low price that turns into a stream of extras can cost more and create a far harder working relationship than a fair one from the start.

After the numbers

Once the quotes are truly comparable, the price is only one factor. Weigh it against the checks on the builder, their past work and how well they communicated during pricing. How a builder deals with your questions now is a good guide to what it will be like later.

We provide an itemised quotation, a payment plan and a contract before any work starts. You can read how a project runs on our approach page.

Sources

This guide is general information for homes in England, not legal, tax or planning advice. Rules change and every house differs, so check with your local planning authority, your building control body or a qualified adviser before relying on it.