Published 5 November 2026. Sources last checked 5 November 2026.
An indoor pool building is a house for water. It has to handle heat, humidity and chemicals all year round, while also looking good from the garden and from inside the home. The projects that work well are thought through as a whole from the beginning, so here is what to consider first.
Start with how you will use it
Is the pool for serious swimming, for family time, for exercise or for relaxing? The answer affects the length, depth and shape of the pool, and whether you also want a changing room, a shower, a sauna or a place to sit. It will also tell you how it should connect to the house, and how far you are willing to walk in winter.
Choosing the position
Look at where the sun falls, and at how the building will look from the main rooms of the house. Think about privacy from neighbours, and the effect on the rest of the garden. Check for tree roots, slopes and drains. Thames Water says that in its area you are likely to need a build over agreement to build within 3 metres of a public sewer.
Consider the route from the house too. It will be used in bare feet, so it needs to be pleasant and safe in wet weather.
Does it need planning permission?
Some pool buildings can be permitted development, provided they meet the conditions for outbuildings. The Planning Portal lists swimming pools among the examples. For houses in England, these include:
- Purpose: it must be incidental to the enjoyment of the house
- Position: not forward of the wall forming the principal elevation
- Height: single storey, with eaves up to 2.5 metres and an overall height of up to 4 metres with a dual-pitched roof, or 3 metres with any other roof
- Near a boundary: no more than 2.5 metres high within 2 metres of a boundary
- Coverage: buildings and additions must cover no more than half the land around the original house
- Raised platforms: none over 0.3 metres, and no verandas or balconies
On designated land, buildings and pools at the side of a property need planning permission. Within the curtilage of a listed building, any outbuilding needs planning permission.
A pool building can easily exceed these limits, so a planning application is often part of the project. Where you do rely on permitted development, consider applying for a lawful development certificate to confirm it in writing. Local rules may also apply, so check with your local planning authority.
Building regulations
Do not assume that an outbuilding escapes building regulations. The Planning Portal says they usually do not apply below 15 square metres, and that approval is usually not needed between 15 and 30 square metres if there is no sleeping accommodation and the building is at least one metre from any boundary or built mainly from non-combustible materials. A pool building will generally be larger than that, so plan on needing approval. Your building control body can confirm what applies.
Humidity and ventilation
This is the key technical issue. A heated pool constantly gives off moisture. If that moist air reaches a cold surface, it condenses. Over time this can damage the structure and finishes.
Your specialist should design the ventilation and dehumidification system alongside the building. It should also be considered with the insulation, since warm and moist air needs to be kept away from any cold parts of the structure. Do not treat this as an item to add later.
Choosing the structure
Timber, render and brick can all work when properly designed. The important question is how each one deals with moisture and chlorinated air. Ask how fixings and metalwork have been specified, because these conditions can be harsh on them. The look of the building should also suit the house and the garden.
We build pool buildings in three ranges: Classic, Signature and Distinctive. You can see photos of each on our pool buildings page.
Glazing
Large windows are often what make the space special, joining the water to the garden. They also lose heat, attract condensation and can overheat in the summer. Ask how the frames and glass will perform in these conditions, and how air will move over the glass to keep it clear. Consider privacy and how the windows will be cleaned too.
The pool and its plant
The pool needs filtration, water treatment and heating. All of this needs a plant room, with good access for servicing, ventilation and safe storage of chemicals. Allow enough space, and keep noisy equipment away from quiet rooms and from your neighbours.
Think about a pool cover early as well, since it can affect both the building’s layout and how much moisture and heat the pool loses.
Ground and drainage
A pool is a large excavation, and it has to deal with the ground and any groundwater around it. Ask your engineer to look at both. Plan how the pool would be drained for maintenance, and where the water would go.
Access during the build
Getting a digger past the side of the house or across a lawn is often the first practical challenge. Plan how machinery and materials will reach the site, what will be protected and which parts of the garden will need rebuilding. It helps to think about landscaping at the same time as the building.
Safety
Consider who could reach the water, especially young children and visitors. Doors, locks and covers should all be part of the design rather than left until the end.
Next steps
Bring your thoughts, your site plan and some photos of the garden to a first conversation. See our pool buildings page for examples of our work. The first consultation is free of charge.
Sources
- Planning Portal: Outbuildings and planning permission
- Planning Portal: Do summerhouses or garden offices need building regulations approval?
- GOV.UK: Lawful development certificates
- Thames Water: Do I need a build over agreement?
This guide is general information for homes in England, not legal, tax or planning advice. Rules change and every house differs, so check with your local planning authority, your building control body or a qualified adviser before relying on it.
