Planning permission decides whether you can build something. Building regulations decide whether it is built properly: its structure, fire safety, insulation, ventilation, drainage and more. They are separate, and most significant home projects need to meet the regulations even when no planning application is needed.
When do you need approval?
GOV.UK says you must check whether you need approval before you construct or change buildings in certain ways. The regulations cover the construction and extension of buildings. Alterations can also need approval, such as replacing windows and doors or installing or replacing a heating system.
Common home projects that usually involve building regulations include extensions, loft conversions, basements, removing load-bearing walls, new drainage and rewiring. The technical standards are set out in the government’s approved documents.
Who can approve the work?
For a typical house, there are three routes.
Your local authority building control team. Every council has one.
A registered building control approver. This is a private alternative to the council.
A competent person scheme. For certain work, such as gas and some electrical installations and window replacement, GOV.UK says you do not need to apply yourself if you use someone registered with a scheme. They can self-certify their own work.
Buildings classed as higher risk follow a different route through the Building Safety Regulator, but that does not apply to ordinary houses.
Full plans or building notice?
If you use local authority building control, there are usually two kinds of application. Procedures vary between councils, so check with your own. Redbridge Council’s guidance gives a useful outline.
Full plans
You submit detailed drawings before work starts, and they are checked. You receive an approval notice, which gives you confidence in the design before you are on site. Redbridge says this can take up to 8 weeks, though it is often faster. It suits more complex projects.
Building notice
This is a simpler procedure. You give notice and a surveyor visits once work has started to discuss the plans and agree inspections. You may still need plans and structural calculations. Redbridge says this is usually used for minor works, such as removing an internal load-bearing wall.
The trade-off is that you have no approved plans before you begin, so any problem is found on site.
What happens during the work?
The building control surveyor inspects at key stages, such as foundations, drains and structural elements. Make sure inspections are booked before the work is covered up. If work is hidden before an inspection, it may need to be opened up again.
Completion certificates
When the work is finished and complies, you should receive a completion certificate. Keep it. GOV.UK notes that you need certificates of compliance to sell your home. Ask about it before the end of the project, and consider making it a condition of the final handover.
What if work was done without approval?
GOV.UK says the person doing the work could be prosecuted and fined if they do not comply with building regulations, and the building control body could require you to pay to fix faulty work.
If work has already been carried out without approval, your local authority may be able to deal with it through a regularisation application. Redbridge notes that this can require work to be exposed, removed or corrected before a certificate of regularisation is issued. It is available only from the local authority.
If you are buying a house that has been altered, ask to see the certificates.
Your duties as a client
Since October 2023, the regulations have set out duties for clients, designers and contractors. If you are having work done on your home, and not as part of a business, you are a domestic client. On a project with more than one contractor, you should appoint a principal designer and a principal contractor. The regulations say that if you do not, the designer in control of the design phase and the contractor in control of the construction phase take those roles.
In practice, ask your builder and designer to confirm these roles in writing.
Who should apply?
Your builder or architect usually handles the application, but you should agree who does it and who pays the fee. Being the homeowner does not remove your interest in getting it right, since the certificate stays with the house.
We include building regulations in the approvals we plan for a project, alongside planning permission and party wall agreements. Read more on our approach page, or see our guide to removing a load-bearing wall.
Sources
- GOV.UK: Building regulations approval
- GOV.UK: Approved documents
- Redbridge Council: Choosing the right building regulations application
- Merton Council: Building control applications and fees
- Legislation.gov.uk: Building Regulations etc. (Amendment) (England) Regulations 2023
This guide is general information for homes in England, not legal, tax or planning advice. Rules change and every house differs, so check with your local planning authority, your building control body or a qualified adviser before relying on it.