Removing a load-bearing wall: what the work involves

What removing a load-bearing wall involves: identifying it, calculations, building control, party walls, temporary support, steel beams and making good.

New timber studwork between old brick walls, with the roof open above

Published 5 November 2026. Sources last checked 5 November 2026.

Opening up two rooms can transform how a house feels. If the wall between them carries weight from above, though, it cannot simply come out. Its load has to be transferred safely to something else, usually with a steel beam. Here is what the work involves.

Is the wall load-bearing?

You cannot tell for sure just by looking at or tapping a wall. A wall can carry floors, a roof or other walls above, even when it looks slight. A thick wall may carry little, while a modest one may be doing important work. Old houses have often been altered too, so past changes may have moved the loads around.

Ask a structural engineer. They may need to lift floorboards or open up a small area to see which way the joists run and what sits above.

Do you need permission?

The Planning Portal says you do not need planning permission to move internal walls. However, removing a load-bearing wall will require building control approval, as it alters the structure of the property. If your house is listed, other consents apply, so check first.

The Portal also says internal wall work may affect fire escape routes, ventilation, drainage or electrics, so these should be considered in the design. In some houses, removing a wall can change the protected route out in a fire, so this is worth raising early.

The structural calculations

The Planning Portal says you will need a structural engineer’s report with calculations. The engineer will work out the loads, specify the size and type of beam and show how the ends will be supported. They will often also specify padstones or posts, so the load travels down to something that can carry it. In some cases, the foundations need to be checked or strengthened.

Which building control route?

Your builder or designer can apply through your local authority or a registered building control approver. A local authority building notice is often used for this kind of minor work. Redbridge Council’s guidance gives removing an internal load-bearing wall as an example, while noting you may still need plans and calculations. Our building regulations guide explains the options.

Does the Party Wall Act apply?

It can. The Act covers work to a party wall. The government’s guidance gives cutting into a wall and removing chimney breasts as examples. If a beam will sit in a party wall, you will probably need to serve notice at least two months before that work. See our guide to the Party Wall Act.

Check for hidden hazards

Before the work starts, find out what runs through the wall. It may contain cables, pipes or flues.

Asbestos is also a consideration. HSE says it may be part of any commercial or domestic building built or refurbished before the year 2000. If your house falls into this group, have this checked before anything is disturbed.

How the work usually runs

1. Protect the house

Floors, stairs and furniture are covered, and the area is sealed as far as possible to limit dust.

2. Temporary support

Before any masonry comes out, the structure above is held up with temporary props, often using horizontal “needles” through the wall. The arrangement should follow the engineer’s guidance. This is the most safety-critical part of the job.

3. Taking out the wall

The wall is carefully removed from the top down, and the rubble is taken out. Dust and noise are at their highest during this stage.

4. Installing the beam

The steel is lifted into place and sits on the agreed bearings. Long or heavy beams can be difficult to get into a house, so the access route should be checked in advance. Sometimes a beam needs to be delivered in sections and bolted together on site.

5. Inspection

The building control surveyor inspects the steel and its bearings before they are covered. Steelwork may also need protection against fire, as agreed with building control.

6. Taking out the props and making good

The gaps above the beam are packed, and the temporary supports come out once the engineer’s requirements are met. Walls and ceilings are then finished, and floors are repaired where the wall once stood.

What you may also need to think about

  • A dropped beam or a flush ceiling. A beam set within the floor gives a flush ceiling, but it is more work and depends on the joists above.
  • Floor finishes. The two rooms may have different floor levels or build-ups.
  • Heating and lighting. A larger room may need a new layout for both.
  • Cracks. Some small cracks can appear as a structure settles after alteration. Ask what to expect.

Finish with the paperwork

Keep the calculations and your completion certificate. A future buyer’s solicitor is likely to ask for them.

Our structural alterations service covers wall removals, steel beams and new openings, with calculations from our in-house structural engineer. You can also see structural work as part of our complete refurbishment of a house in Sutton.

Sources

This guide is general information for homes in England, not legal, tax or planning advice. Rules change and every house differs, so check with your local planning authority, your building control body or a qualified adviser before relying on it.