Can you stay at home while the builders are in? It depends on the work. For a complete refurbishment most families move out, while for an extension you can often stay. That is the answer we give clients at the first conversation, and the detail below is what sits behind it.
When staying usually works
Staying is more realistic when the work is contained and a part of the house can be sealed off. A rear extension is the classic case. Most of the early work happens outside the existing walls, and the disruption peaks when the two parts of the house are finally joined.
A loft conversion can work in a similar way, because much of the work happens above and access can often be arranged from outside. The moment the new staircase comes through is the disruptive part.
When moving out makes sense
Consider moving out if:
- The work covers most of the house, or the only staircase
- Heating, hot water or electricity will be off for long periods
- The kitchen and every bathroom are affected at once
- You have young children, or someone at home with a health condition affected by dust
- Asbestos has been found and needs to be dealt with
Moving out also tends to help the build itself. Trades can work freely, without protecting a route through occupied rooms or stopping to restore services every evening.
Questions to settle before work starts
Which services will go off, and when?
Ask for a plain list. Water, heating, power and drainage are all affected at different stages. You can plan around a known shutdown far more easily than an unexpected one.
Where will you cook and wash?
A temporary kitchen needs water, drainage, power and ventilation, not only a kettle and a microwave. Decide where it goes and how long it will be needed. Make sure at least one working bathroom is available, or agree what happens when it is not.
How will dust be controlled?
Dust travels further than most people expect. Ask how the working area will be sealed, whether a separate entrance can be used, and what will be cleaned at the end of each day. Move anything precious into storage rather than relying on dust sheets.
Who will come and go, and through which door?
Agree site hours, the route into the house, who holds keys and where materials are stored. If the back of the house is open during the work, ask how it will be secured at night.
How will you stay informed?
Staying at home is much easier when you know what is coming next week. With us, clients receive photos with a short written update, daily or weekly. The site manager visits once or twice a week. Whoever you appoint, agree how updates will work before the first day on site.
Phasing the work
Phasing means completing one area before starting the next, so you can move around the house as it progresses. It can make staying possible, but it usually lengthens the programme and adds cost, because trades return several times and protection has to be set up repeatedly. Ask your builder to compare a phased programme with a single continuous one.
Children, pets and working from home
A building site is not a safe place for children or pets, even at weekends. Tools, openings and materials may be left in place between working days. Agree clear boundaries and keep them.
If you work from home, assume that some days will be too loud for calls and plan somewhere else to go. Breaking out concrete or masonry is hard to work around, even a floor away.
Your neighbours
Tell your neighbours early what is planned and how long it should take. It costs nothing and helps if problems arise. The government’s party wall booklet notes that noise and nuisance sit outside the Party Wall Act and are handled by the local authority’s environmental department, so a calm early conversation is much better than a later complaint.
Making the choice
Compare the cost of moving out with the cost of the extra time and disruption of staying. Then ask your builder for an honest view of your particular project. You can read how we run a project on our approach page, or see our complete refurbishments and extensions pages.
Sources
This guide is general information for homes in England, not legal, tax or planning advice. Rules change and every house differs, so check with your local planning authority, your building control body or a qualified adviser before relying on it.