Most renovation stress comes from one thing: being asked to make a decision after the moment it could easily be made. A change to a socket is simple before the plaster goes on and expensive afterwards. The aim is to make the decisions that affect the building early and leave the ones that do not until later.
These are the choices worth settling first.
The layout
Layout comes before everything else. Live with the drawings for a while. Walk through a normal morning and a busy evening on paper. Check where the doors swing, where coats and shoes will go and where the bins live.
Measure your existing furniture and draw it in. If a much-loved sofa or table has to fit, this is when to find out.
Anything that needs approval
Some renovation work needs approval even when it does not look structural. GOV.UK notes that alterations such as replacing windows and doors or installing or replacing a heating system can need building regulations approval. You do not need to apply yourself if you use someone registered with a competent person scheme. Our guide to building regulations explains the routes.
Outside the house, check for planning limits before you choose new windows or cladding. Rules are tighter on designated land, and an Article 4 direction can remove some permitted development rights.
Heating and hot water
Decide on the heating system and the location of any plant early. Underfloor heating affects floor build-ups and door heights. Radiators affect joinery and furniture layouts. Hot water demand depends on how many bathrooms may run at once.
Make room for the equipment. Cylinders, manifolds and pumps all need space and access for servicing.
Electrics and lighting
Lighting has more effect on how a finished room feels than almost any other choice, and it is decided well before the room exists. Draw a lighting plan with your furniture on it. Then mark:
- Where you need sockets, including inside cupboards and at bedside tables
- Which lights are controlled together, and from which door
- Where a television, speakers or a data point will go
- Any low-level or concealed lighting, which needs to be planned with the joinery
The kitchen
Choose the kitchen layout and appliances before first fix. Extraction, drainage and power all depend on them. An island with a hob or sink needs routes through the floor, so it has to be planned with the structure and floor build-up.
Order early. Kitchens and appliances can have long lead times, and a late order can hold up every trade that follows.
Bathrooms
Fix the positions of showers, baths, basins and toilets early, because waste pipes need a fall and a route. Decide on wall-hung fittings and concealed cisterns before the walls are built, since they need support and space behind the finish. Wet rooms need planning from the floor structure upwards, not only at the tiling stage.
Joinery
Fitted joinery is designed early and installed late. The design tells the electrician where to put sockets and lights. The installation waits until plaster has dried and floors are down, because timber moves in damp conditions. Your joiner should measure the finished walls before making the pieces.
Floors
Add up the thickness of each floor finish, from structure to surface. A change from carpet to stone can alter door heights and thresholds. Decide where different floors meet, and ask for level thresholds if you want them.
Long-lead items
Make a list of anything that takes time to arrive. Typical examples are windows, stone, special tiles, ironmongery, sanitaryware and appliances. Ask your builder when each one must be ordered to meet the programme, and put those dates in your diary.
What can wait
Paint colours, loose furniture, curtains and accessories can come later. Allow for them, but do not let them hold up the decisions that the build depends on.
A simple rule
Before each stage closes up, ask what will be difficult to change afterwards. If you are unsure about something, raise it now. Our renovations, interiors and kitchens and bathrooms pages show the work we do.