A shower room makes a garden room far more useful, whether it serves a home gym, a studio, an office or an occasional retreat for guests. It also changes the project. A simple insulated box becomes a building with drainage, hot water and a real risk of condensation. Here is what to plan for.
Be clear about how you will use it
This matters more than anything else, because the use affects the rules. The Planning Portal’s permitted development rules for outbuildings require that the building is for a purpose incidental to the enjoyment of the house, and they do not cover use as separate self-contained living accommodation.
A gym, a studio or a home office with a shower can fit that description. A building with a bedroom, a kitchen and a bathroom where someone lives independently is much less likely to, and normally needs planning permission. If somebody will sleep there, even occasionally, raise it with your designer at the start, since it also changes the building regulations position.
Check the planning limits
Under the permitted development rules for houses in England, an outbuilding must generally:
- Not sit forward of the wall forming the principal elevation
- Be single storey, with eaves up to 2.5 metres and an overall height of up to 4 metres with a dual-pitched roof, or 3 metres with any other roof
- Be no more than 2.5 metres high within 2 metres of a boundary
- Together with other buildings and additions, cover no more than half the land around the original house
- Have no veranda, balcony or raised platform over 0.3 metres
Different rules can apply on designated land and to listed buildings, and local rules may also apply. If you want written confirmation that the plan is lawful, consider a lawful development certificate.
Check building regulations
The Planning Portal says building regulations generally will not apply to a detached outbuilding with a floor area under 15 square metres and no sleeping accommodation. Between 15 and 30 square metres, approval is usually not needed if there is no sleeping accommodation and the building is at least one metre from any boundary or built mainly from non-combustible materials.
These size rules are not the whole story, because a shower room adds drainage and electrics. Ask your building control body what applies, particularly to the new drainage connection and the electrical work. If your plans include sleeping accommodation, expect building regulations to apply.
Work out the drainage first
This is usually the deciding factor, and the one to check before anything else.
- Where will the waste go? Find your nearest drain and manhole, and check whether you can connect to it.
- Is there enough fall? Waste needs a steady fall to the drain. At the far end of a long garden, the pipe can run out of depth.
- Will you need a pump? A small pump can solve a lack of fall, but it needs power and servicing.
- Is there a public sewer nearby? Thames Water says that in its area you are likely to need a build over agreement to build within 3 metres of a public sewer.
A trench down the length of a garden will disturb planting and paving, so consider it along with any landscaping.
Hot water and heating
Choose how the hot water will be supplied. Running pipes from the house can mean heat loss and a long wait for hot water. A local water heater or an electric shower may suit better, but check that the electrical supply is big enough. Decide too how the building will be heated, and whether it will be kept warm all year or used now and again.
Insulation and condensation
A shower puts a lot of moisture into a small building. Without proper ventilation and insulation, moisture will condense on cold surfaces, and timber-framed buildings are especially exposed if it gets into the structure.
Ask about:
- An extractor fan, and where it will vent
- Insulation in the floor, walls and roof, with no cold spots
- How the construction deals with vapour, so moisture cannot get trapped in it
- Tanking of the shower area, so water cannot reach the structure
Power and data
A garden room with a shower has more demand for power than a simple studio. Have your electrician check the capacity of your supply and the route for the cable, which should be planned with the drainage trench if possible. Electrical work in wet areas needs extra care, so use a suitably qualified electrician.
Foundations and access
Think about how materials will reach the end of the garden, particularly on a terrace with no side access. Ask how far they must be carried, and whether this affects the choice of foundations and construction. Roots from nearby trees can also affect both foundations and drains.
Think about how it looks
From the house, a garden room becomes part of the view. Consider how it relates to the garden and to the materials of the house. Decide how the shower room window will keep its privacy, and place the door and paths where they will feel natural in the rain.
See an example
Our rear extension and garden room in Wimbledon shows a garden room built at the end of the garden as part of a larger project. See our garden rooms page for more, or get in touch to talk through your own.
Sources
- Planning Portal: Outbuildings and planning permission
- Planning Portal: Do summerhouses or garden offices need building regulations approval?
- Thames Water: Do I need a build over agreement?
- GOV.UK: Lawful development certificates
This guide is general information for homes in England, not legal, tax or planning advice. Rules change and every house differs, so check with your local planning authority, your building control body or a qualified adviser before relying on it.