Building a new basement: the questions to answer first

Questions to answer before building a basement under a house: planning, party walls, ground and water, structure, waterproofing, drains, access and neighbours.

Illustration: a section through a terraced house, with a new basement and front lightwell dug beneath it

Published 5 November 2026. Sources last checked 5 November 2026.

A new basement can add space that a house could not otherwise gain. It is also among the most technically demanding projects you can carry out on a home, and it affects the ground beneath your house and possibly your neighbours’. So the first step is not design, but finding out whether it makes sense for your site.

These are the questions to answer before you commit.

Is it a conversion or a new basement?

The two are very different. The Planning Portal says you are unlikely to need planning permission to convert an existing basement into living space, unless you create a new residential unit, change the use significantly, add a lightwell or alter the outside appearance.

A new basement is another matter. The Portal says it will commonly require planning permission, often because of the major works involved and the effect on the outside of the house.

What will your local planning authority allow?

Ask early. The Portal notes that local supplementary planning documents may limit the depth and size of a basement. Lightwells can be sensitive too, with potentially stricter rules at the front of a house and where they are visible from the street.

Talk to your local planning authority before you apply. Ask about flood risk, trees and any basement policy that applies to your area.

What is the ground like?

You need to understand the ground before you can design the basement. A site investigation will look at:

  • The soil type and how it behaves
  • The level of groundwater, and how it may change
  • Any nearby rivers, culverts or history of flooding
  • What is under your existing foundations

These findings shape the structure, the waterproofing and the method of construction.

How will the house stay up?

The existing house has to be supported while the ground beneath it is removed. A structural engineer will design both the permanent structure and the temporary works, which can involve underpinning the walls in carefully sequenced sections. The Planning Portal notes that underpinning and foundation work may be needed.

Ask how movement will be monitored during the work, and what happens if readings go beyond agreed limits.

How will it stay dry?

Water is the central technical issue with any basement. The Planning Portal lists damp proofing among the areas covered by building regulations. Designers commonly work to BS 8102, the British Standard on protecting below-ground structures from water, and the Basement Information Centre also publishes guidance.

Ask your team:

  • What is the waterproofing system, and who designed it?
  • Is there a pumped drainage system? How is it serviced, and what happens during a power cut?
  • Who stands behind the waterproofing if something fails later?

What about your neighbours?

Basements very often fall under the Party Wall Act. You must give notice if you excavate within 3 metres of a neighbouring building and go deeper than its foundations, or within 6 metres if the work reaches a line drawn downward at 45 degrees from the bottom of its foundations.

Allow time, since notice for this work must be given at least one month ahead, and a party wall award may be needed. Read our guide to the Party Wall Act. Talk to your neighbours early, because they will notice this work more than most.

Where are the drains?

Check for public sewers near the house. Thames Water says that in its area you are likely to need a build over agreement to build within 3 metres of a public sewer. Think too about how the basement’s own drainage will reach the sewer, because it may sit below the level of the main drain.

How will materials get in and out?

A basement means taking a large amount of soil out of the site, often through a small space. Ask how spoil will be removed, where a conveyor or skip can go and whether you will need permits for the road. On a tight London street, this can decide the method and the programme.

What will building regulations require?

Building regulations cover areas such as fire escape routes and ventilation as well as structure and damp. A basement with bedrooms needs a safe means of escape. Natural light and fresh air also affect how the rooms feel to use, so consider them early.

Can you stay at home?

Ask your builder whether staying is possible. Noise, vibration and service disruption can be substantial, and many owners choose to move out. Our guide to living at home during building work can help.

What should you do first?

Start with a feasibility review from a structural engineer and an architect. It should tell you whether the project is possible, what the main risks are and what further investigation is needed. It is a small cost compared with the build.

See our basements page, and speak to us about your house. We have our own in-house architect and structural engineer, and the first consultation is free of charge.

Sources

This guide is general information for homes in England, not legal, tax or planning advice. Rules change and every house differs, so check with your local planning authority, your building control body or a qualified adviser before relying on it.